The Project
Pacy & Wheatley Dry Lining have begun working on a steel frame structure in Sheffield which will create a new 80 bed luxury care home. We have been appointed to install the steel frame structure to the external walls which we will the insulate and board both externally and internally.
The Challenge
As a Considerate Contractor, we will ensure that all plant and machinery used and site noise will be kept to a minimum, reducing the disturbance to the surrounding area. Special measures will be implemented to ensure safe practices throughout the project, including hoarding off the area to create a safe working environment.